AI Success Stories

MTR Success Stories:

The following are AI success stories related to MTR:

hk mtrc - train timetabling / dispatching

HK MTRC

Train Timetabling/Dispatching - To enhance customer service, MTRC needed to increase train frequency during its peak rush hours. Using AI to capture knowledge of train movements within the depot area, our algorithms automatically generates a plan that allows additional trains to be dispatched in the tightly congested depot interlocking area. [more]

hk mtrc - possession/engineering works scheduling 2010

HK MTRC

Possession/Engineering Work Scheduling - After the merger with KCRC, MTRCL needed a single AI system to schedule and manage all engineering works across all railway lines. The AI Engine deployed in 2004 was enhanced and updated. AI allows MTRCL to perform more engineering works with its existing resources. [more]

hk mtrc - possession/engineering works scheduling 2004

HK MTRC

Possession/Engineering Work Scheduling (2004) - AI is used to prioritize and schedule all engineering works in this busy subway system, while maximizing resource utilization and ensuring all safety and operational rules and regulations are followed. This projectis was performed in 2004 prior to the railway merger. A new version was later created in 2010 after the merger to handle the needs of all railway lines. [more]